The National Capital Region Transport Corporation (NCRTC) has started track laying activities inside the constructed tunnel on the Delhi-Ghaziabad-Meerut RRTS corridor. The 750-meter long tunnel at Meerut was completed in October, 2022 from Gandhi Bagh to Begumpul RRTS station. For the smooth movement of trains in the underground section of the RRTS corridor, two parallel tunnels have been constructed and it was recently completed.