KAKINADA: After a long wait, the construction of a flyover at Morampudi junction in Rajamahendravaram of East Godavari will begin on September 22. Union Minister for National Highways Nitin Gadkari will lay the foundation stone and the works will be done at a cost of Rs 56.09 crore, over a length of 1.42 km.
The Morampudi junction is a dangerous cross on the highway. The residents and the people from Kesavaram, Punyakshetram, Namavaram, Hukumpeta, Bommuru, the Gadalamma Vegetable market going to Rajamahendravaram have to cross the bridge through the NH. There have been many accidents in the area.