Tracks have been laid out for testing of Regional Rapid Transport System (RRTS) trains at Duhai Depot. At least 11 stabling lines, two workshop lines and three Internal-Bay Lines (IBL), and one Heavy Internal Cleaning (HEC) line are being prepared, said a senior National Capital Region Transport Corporation (NCRTC) official.
According to the NCRTC, “It is soon to arrive at Duhai Depot, Ghaziabad, and the Depot is gearing up for its arrival. The tracks have been laid out, and preparations are being made for the testing of the train at the Depot. For the operation of the RRTS trains, an administrative building has also been constructed in the Depot.”