The vehicular movement on the 325-meter-long Telmacho bridge has been completely suspended from Friday for the repair work of the bridge.
The movement of all kinds of vehicles including heavy vehicles like bus, truck, tipper, trailer and other smaller vehicles like SUV, motorcycles has been suspended for two days, December 4 and 5. The Telmacho bridge on the Damodar river connects Dhanbad and Bokaro.
Confirming the development, Dhanbad Deputy Commissioner, Uma Shankar Singh said, “All traffic between Dhanbad and Bokaro has been diverted on Birsa bridge passing through Digwadih and Mohalbani area of Dhanbad for the two days during which the maintenance as well as load testing work of the bridge will be carried out.”