The National Thermal Power Corporation’s (NTPC) North Karanpura power plant will start power generation after a long wait of 23 years.
The trial of 660 MW power generation and transmission at full load from the first unit of this plant was successful on Tuesday. The generated electricity was sent to the National Grid.