Domestic solar equipment manufacturers have requested the ministry of new and renewable energy (MNRE) to stick to the plan of using indigenously manufactured components in the Pradhan Mantri Kisan Urja Suraksha evam Utthan Mahabhiyan (PM-Kusum) scheme.
In a letter written to power minister RK Singh, the Indian Solar Manufacturing Association (Isma) said, in the wake of favourable market visibility stemming from the Kusum scheme, existing manufacturers (Adani Group’s Mundra Solar, Jupiter Solar, Premier Solar, Euro Multivision and Renewsys) have short-term investment plans to set up 2,400 MW of solar cell-making capacity. The current installed cell manufacturing capacity is 3,164 MW.
In the letter, reviewed by FE, Isma has requested the government to “maintain the resolve to develop a solar manufacturing base in India, which we are sure will happen in the next 15 to 24 months”. It said the government’s mandate on domestic equipment will increase solar-cell manufacturing base to 8-10 GW by 2021. However, “implementation of the above plans are subject to continued demand visibility/and protection from imports of cells and modules, at dumped prices, from China/Taiwan/Malaysia/ Vietnam and financial closures with Indian banks and institutions”, Isma warned.