A month after the Sir M Visvesvaraya terminal at Baiyappanahalli (SMVB) was opened for commercial operations, the number of trains have now crossed 10. The number of passengers arriving and leaving the station is growing significantly.
While there has been a lot of attention paid to the sprucing up the terminal, the issue of last mile connectivity has been forgotten. Especially, when SMVB has the potential to be the heart of the suburban railway network.
DH visited the Baiyappanahalli metro station for a reality check on the connectivity to the Sir MV terminal.