Around 400 allottees have been provided possession of plots in Punjab Urban Development Authority’s (PUDA) township Gateway City in Sectors 118 and 119, but even after six years, there is no connectivity in one of the pockets that has around 100 plots.
The allottees have even alleged there are no basic amenities like sewerage system, that there are high-tension wires and a dump yard near the site.
It was in 2014 that PUDA had floated the scheme for the township offering plots ranging from 150 to 500 square yards at a reserve price of ₹21,000 per square yard.
150-ft road connecting airport was promised
The brochure had promised a 150-foot connecting road from the Airport road to the township. Six years on, however, PUDA has failed to acquire the land for the said road.