HYDERABAD: The 1.78-km-long second-level flyover at the Bairamalguda junction built at a cost of Rs 148.05 crore is likely be inaugurated by Chief Minister A Revanth Reddy this week.
The unidirectional flyover will help in the free flow right turn traffic of the inner ring road from Owaisi junction to Vijayawada (towards Chinthalkunta) and to Nagarjuna Sagar (towards B N Reddy Nagar). Also, two loops (clover shape) on the LHS and RHS sides are ready. The flyover will help in saving in travel time and fuel, reduction in pollution and noise.