HYDERABAD: Completing the proposed 2.8 km steel flyover at RTC X Roads would be a challenging task for the Greater Hyderabad Municipal Corporation (GHMC), not just because of the heavy traffic on the road, but also because it would have to be built over the Metro rail and 90 feet from the ground level.
Once completed, this flyover would be an architectural marvel, with the Metro trains passing between two roads. The civic body has opted to use steel as it would enable faster completion of the work, considering the heavy traffic flow on this stretch. The flyover would be a 16 metres wide four-lane elevated corridor from Indira Park to VST Junction, passing through NTR Stadium, Ashok Nagar and RTC X Roads.