CHENNAI: After removing assets, materials, and equipment from the decommissioned Ennore Thermal Power Station, Tangedco will build gas-fired power projects. “As part of the zero carbon initiative, Tangedco has planned to execute re-gasified liquefied natural gas (R-LNG) power projects of smaller capacity, ranging from 18 to 20 MW, totalling 2,000 MW,” an official told TNIE.