Patiala The Northern Regional Load Despatch Centre (NRLDC), the apex body to ensure integrated operation of power system in the northern region, has warned the Punjab State Power Corporation (PSPCL) against drawing the maximum limit of power from the northern grid, without running its own thermal units at Ropar and Lehra Mohabbat.
For the past fortnight, Punjab has shut its own power plants and is drawing power from the grid. This power is available at half of the state’s generation cost. Punjab has been generating around 4,500 MW, but is drawing almost 7,000 MW from the grid.