Hyderabad: The Outer Ring Road (ORR) is set for a makeover and beautification after 12 years. Faced with problems of wear and tear, the road will be re-laid over a stretch of 158 km. To start with, a stretch of 25 km will be re-laid from Shamshabad to Gachibowli.
The HMDA has floated tenders of Rs.63.71 crore as also another one for `45 crore for an automated drip irrigation system for watering the plants on the medians.