VISAKHAPATNAM: The plant load factor (PLF) at NTPC Simhadri has gone up to 65% from the last fiscal’s 48% due to considerable increase in the demand for electricity. NTPC Simhadri CGM Diwakar Kaushik said the PLF, which is the ratio between the actual energy generated by a plant to the maximum possible energy that can be generated for a duration of an entire year, at the plant will reach 70% next year.
“As coal import, which was suspended due to Covid will resume, there will be no shortage of the commodity. The NTPC is set to get two lakh metric tonnes of coal from Indonesia in two months,” he told media persons here on Monday.