CHENNAI: The Southern Railway will soon demolish an old foot overbridge (FOB) whose pillars are located too close to tracks on platform one of Guindy railway station, violating the safety norms. This comes as a new 12-m wider pedestrian FOB linking the eastern entrance (Race Course Road side) with the metro station on the western entrance (GST Road side) nears completion.