The National Capital Region Transport Corporation (NCRTC) has officially begun the trial run for Namo Bharat trains, marking a significant milestone for the Regional Rapid Transit System (RRTS) corridor between Duhai and Meerut South stations. The trial run signifies a crucial step towards making the entire 42 km stretch of the Delhi-Ghaziabad-Meerut RRTS corridor operational in the near future, according to an official statement by the NCRTC.
Comprehensive Testing of Namo Bharat Trains
During the trial runs, Namo Bharat trains are undergoing thorough testing to evaluate the fitness of all subsystems and equipment. The testing involves the operation of the train along the entire length at various speeds, initially under manual control as part of the train control management system.