Mumbai Airport on Tuesday said both its runways will remain temporarily closed for operations for five hours on May 2 as part of the facility’s monsoon contingency plan.
The scheduled temporary runway closure is an annual exercise and a contingency plan on the same will help maintain operational continuity and ensure passengers’ safety, the private airport operator said in a statement.
The exercise involves specialists in engineering and airside teams inspecting the runway surface for micro-texture and macro texture wear and tear that may have occurred due to day-to-day operations and help strengthen the airside strip, it said.