The Ministry of Railways has sanctioned the Final Location Survey (FLS) of Outer Ring Rail line in Telangana. This is one of the important projects to strengthen rail connectivity in the state. The FLS will be conducted by the South Central Railway (SCR) officials.
Cost for FLS of Telangana’s Outer Ring railway line:-
The national transporter has allotted a fund of Rs 12,408 crore for the Final Location Survey. This railway line is likely to stretch for a distance of nearly 564 kms.