BENGALURU: The Bengaluru Metro Rail Corporation Limited (BMRCL) will begin the demolition of the flyover at Jayadeva Hospital from January 20 to start construction of the new elevated road-cum-rail flyover including the Jayadeva Junction Interchange Metro station, according to an official release.
The Electronic City Corridor is part of the Reach-5 Line (RV Road to Bommasandra) of Phase-2. BMRCL listed out changes to traffic movement as a result of the demolition: Jayadeva flyover will be closed to all types of traffic; the Outer Ring Road (ORR) between 18th Main of Marenahalli Road to 29th Main of BTM 2nd Stage will be closed to traffic in both directions from 10.30 pm to 5.30 am; the ORR between 18th Main of Marenahalli Road to 29th Main of BTM 2nd Stage will be open from 6 am to 10 pm to BMTC buses, ambulances and two-wheelers only – movement of all other vehicles such as cars, private buses, autorickshaws, trucks, and tractors will be prohibited even between 6 am to 10 pm.