India needs to add thermal coal-based power generation capacity of 80 GW against the 27 GW currently under construction as the peak power demand in the country would spike to 335 GW by 2030 from 241 GW at present, Union Power Minister R K Singh said on Tuesday.
Singh presided over a review meeting on thermal power capacity addition in the country where independent power producers and state-owned generators NTPC, SJVN, NHPC, DVC, THDCIL, and NLCIL participated virtually and in physical mode on Tuesday.