CHENNAI: About 11 km of the newly laid third line between Tambaram and Guduvancheri was inspected by the Commissioner of Railway Safety (CRS) on Thursday. The team also conducted a high-speed trail in the reverse direction, for which an empty rake was operated at a speed of 130 km/ph.
The track was is part of the 31-km third line between Tambaram and Chengalpattu. During the first phase, a 11-km line was laid between Guduvancheri and Singaperumalkoil, which received nod for operation on October 30 last year.