Two months since it was inaugurated by chief minister Uddhav Thackeray on August 1, the Ghatkopar-Mankhurd flyover has still not been opened for heavy vehicles. It will take up to two more months before heavy vehicles are allowed to use the flyover, civic authorities from the bridges department said.
According to the Brihanmumbai Municipal Corporation (BMC), a high-tension wire runs overhead the bridge, and until it is shifted, height restrictions for vehicles on the bridge cannot be revoked.
BMC needs to construct a pier at an alternate location to shift the high-tension wire over the bridge, and will require 225 square metres of land, which falls under the jurisdiction of the collector.