BENGALURU: An undetected oil leak caused a blast, leading to a fire, in the gas turbine chamber at the Yelahanka Gas Power Plant of the Karnataka Power Corporation Limited (KPCL) in Yelahanka New Town around 3.30 am on Friday. Fifteen KPCL employees, 11 of them ground engineers and one executive engineer, sustained burns.
The power plant was to start generating 20-30 MW of power on Friday and supply to the grid. The capacity of the plant is 370 MW and Bharat Heavy Electricals Ltd (BHEL) was executing the project for which General Electric (GE) is supplying compressed natural gas (CNG).