Despite heavy rains and continued resistance by some owners a team of the district administration and the National Highways Authority of India (NHAI) succeeded in demolishing around 20 more structures on both sides of the Balongi-Kharar road on the third day of the demolition drive today.
As soon as rain stopped the team sprung into action and demolished 20 structures in Balongi and Khanpur.
The NHAI project director, Krishan Sachdeva, said, “In this way as many as 105 structures out of 300 have been demolished. The three-day demolition drive has been successful.”