The construction of the Russia-supported Kudankulam Nuclear Power Plant (NPP) Unit 6 was launched on Tuesday through the first concrete in the foundation slab of the reactor building.
“The first two NPP power units are demonstrating sustainable operation at the nominal power level. The power units of the second stage are being constructed, namely the works are underway at Unit 3 to prepare for installation of the reactor pressure vessel,” according to Russian nuclear major Rosatom which is constructing the NPP.