Palwal: The ongoing construction of the 2.5-km long elevated flyover in the city has been going on at a snail’s pace. Due to the construction, very little space is left on the service roads. Also, the available waterlogged passage on these roads is laden with potholes. Traffic jams and altercations have become an everyday affair. All this has not only inconvenienced local residents, but also commuters on the national highway. It is incumbent on the administration to speed up the work. — Ajay Jakhar