Businessmen in the Industrial Area, Phase 1, are a harried lot due to a divider that has come up on the road from the SDM East office to the Poultry Farm chowk.
A team, including industrialists Rakesh Aggarwal, Akshay Chugh and Avi Bhasin from the Laghu Udyog Bharati, recently met the UT Chief Engineer and requested him to provide cuts between the road divider. They said the cuts were required to enter the units on both sides of the main road. Without cuts in the divider, the industrial traffic would have to take a long route that might create pressure on traffic lights near the tube well and Colony No. 4 entry road.