Brahmaputra Infrastructure have received a LOA from the office of Executive Director ( T.) – National Highway & Infrastructure Development Corporation of India for the execution of the Rehabilitation and Up-gradation of road from design Km 25.250 to Km 36.460 (Total Length: 11.210 Km) of Kailashahar – Kurti Bridge section of NH-208A to two lane with paved shoulder in the State of Tripura on EPC mode (Package III)-Balance work- Letter of Acceptance (LOA)- of an total amount Rs. 59.84 crore.