The Union Government has decided that there will be no booth on any lane of the toll plaza and, by doing so, some additional toll lanes will be constructed at the space saved by eliminating these booths on the highways. In this way, now the vehicles shall move from newly constructed 10-12 lanes in place of currently available of 6 lanes only that will save near about 3-4 minutes of each vehicle passing through the toll plaza.
In first instance, the toll plazas situated on Indore-Betul-Nagpur highway will be constructed based on this modified design. This Project Highway is being operated by PATH India Company [Prakash Asphaltings & Toll Highways (India) Limited]