BENGALURU: Even as the Bangalore Metro Rail Corporation Limited (BMRCL) races against time to meet the revised deadline of December 2024 for Metro Phase-II, a section of residents residing along Outer Ring Road Line have asked the agency to stop construction work by 10pm. The noise from construction disturbs their sleep, the residents complained.
The 18.2-km ORR Line (Phase 2A) runs from KR Puram to Central Silk Board Line and comprises 13 stations. The tender has been awarded in two packages. The first runs of 9.8km from Silk Board to Kaadubeesanahalli, awarded at a cost of Rs 785 crore, and the second, awarded at a cost of Rs 623 crore, runs from Kodibisanahalli to KR Puram.