A village located just 6 km from Baramulla town is craving for better roads for the past 10 years.
The residents of village Chakloo said that the inner links to the village have not been macadamised for the past 10 years creating hardships for entire population of the area.
Locals said the 3-km road connecting village Chakloo with the Baramulla-Handwara highway was in shambles.
They said the road had not been blacktopped and repaired for 10 years now.
“The administration carried macadamisation of 1 km road in 2010 but left it without proceeding further,” they said.