Three private companies have evinced interest in constructing the proposed cable-stayed bridge over Hudco Lake in suburban Govindpur. Two of these are from Calcutta and the third from Delhi. The tender was opened here on Saturday.
“Three construction firms, including the one that set up Domuhani bridge over Subernarekha river, have shown interest. We will do a comprehensive study of the firms concerned and award the tender to the best,” said executive engineer Sanjay Kumar Singh of the road construction department’s Jamshedpur division.
Singh added that the suspension bridge would be ready within the stipulated period of two years.