Track work for Mumbai-Ahmedabad high speed rail corridor begins

AHMEDABAD: The construction work of first reinforced concrete (RC) track bed for the Mumbai-Ahmedabad high speed rail corridor track system as used in Japanese Shinkansen, began in Surat. This is for the first time, the J-slab ballastless track system is being used in India.

The track system comprises of a pre-cast track slab over which fastening devices and rails are fitted. This slab rests on the RC track bed which has a thickness of approximately 300mm and constructed in-situ (at site) for individual up and down track lines on viaduct top. The width of RC track bed is 2420mm.

Read more

You may also like

Comments are closed.

More in Newspapers