Sivok- Rangpo rail project inching to bring Sikkim on Railways map, work on 6th tunnel finished
Indian Railways has made its major groove by working on the prestigious Sivok – Rangpo rail line project (SRRP) as it has completed the construction of tunnel number 11 (T-11). This is the sixth breakthrough of a total 14 tunnels in the project.
The T-11 is the longest tunnel to date of the Sivok-Rangpo rail project. The length of the main tunnel is 3,205 metres and the Evacuation Tunnel is 960 metres. The tunnel is located in between Tarkhola and Tumlangkhola area of Kalimpong district in West Bengal.









