Months after starting of the construction work of an ROB and two RUBs on Pakhowal Road, the project plan and work specifications have not been displayed at construction sites. After barricades have been installed to stop the vehicular movement from near Canal Bridge till Hero Bakery Chowk on Pakhowal Road recently, residents and shopkeepers on the stretch are a harried lot.
Several persons complained that the way leading to their properties remains blocked due to the ongoing project these days. They demand from Ludhiana Smart City Limited and the MC authorities to resolve the problems being faced by them at the earliest.