Patna Metro Rail project: Construction in full swing! Tunneling work begins at Moin-Ul-Haq metro station

The construction work of the Patna Metro Rail project is in full swing. It achieved a major breakthrough on Monday after the first of four Tunnel Boring Machines (TBM) – ‘Mahavir’ was lowered at Moin-Ul-Haq metro station with a drive length of 1,494 m towards Patna University station. With this, the tunneling work of Patna Metro commences for the first time. The underground tunneling work will be done using the TBM machine.

Read more

You may also like

Comments are closed.

More in Newspapers