NTPC commissions 5 MW solar capacity at Auraiya plant in UP

The state-run power major informed that 5 megawatts (MW) last part capacity for 20 MW Auraiya Solar PV project at Auraiya, UP, has been declared on commercial operation from 20 February 2021.

With this, the total installed capacity of NTPC and NTPC Group has become 52,115 mega-watt (MW) and 64,880 mega-watt (MW) respectively and the commercial capacity of NTPC and NTPC group has become 51,315 MW and 64,080 MW respectively. The announcement was made on Saturday, 20 February 2021.

Read more

You may also like

Comments are closed.