Mumbai: Digha railway station likely to be operational by November
THE CONSTRUCTION work of Digha railway station is in the final stage of completion with 70 per cent of the work being over and the facility is likely to be operational by November this year.
The Mumbai Rail Vikas Corporation (MRVC) is building the station as a part of the Airoli-Kalwa elevated road under the Mumbai Urban Transport Project (MUTP) 3. The Airoli-Kalwa corridor will be connecting the Central and Harbour Railway line of the Mumbai suburban rail network in Thane. The project was announced in 2014 at an estimated cost of Rs 420 crore. Prime Minister Narendra Modi flagged off the project in 2016.









