Maharashtra: CM Eknath Shinde to flag off trial run of Metro line 3 today
The trial run of Mumbai’s first underground Metro line 3, also known as Colaba-Bandra-SEEPZ line, which has been under construction since 2016, will start Tuesday, said the Mumbai Metro Rail Corporation Limited (MMRCL), which is executing the 33.5km-long underground Metro corridor.
Chief Minister Eknath Shinde and Deputy Chief Minister Devendra Fadnavis will flag off the trial run at Sariput Nagar in Aarey, where a temporary car shed has been built for assembling Metro car rakes. The trial run will be held inside a 3-km tunnel stretch between the temporary facility of Sariput Nagar and Marol Naka station.









