Chandigarh: SPV Power Plant scheme gets nod, last date for compulsory installation extended
The UT administration has approved the scheme for installation of SPV Power Plants on residential buildings’ rooftops under RESCO mode, under which the residents of UT who have a connected load of 5kWp and more will be eligible, irrespective of their plot size.
A statement issued by the administration said, “The project will be installed equal to the connected load maximum upto 10kWp or depending upon the consumption of the consumer.”
With the approval of the scheme, the SPV Power Plant will be installed with zero investment from the beneficiaries and the project will be transferred to the beneficiaries without any charges after around 15 years, which will be decided through e-tender.








