As Baghjan fire rages on, OIL sets July 30 deadline

The repair of an Oil India Limited (OIL)-operated well in Baghjan in Assam’s Tinsukia district which has been on fire since June 9, is down to a matter of replacing nuts and bolt-like studs and injecting a kill-fluid into the well, which is expected to be completed by July 30, a company spokesperson said Monday.

New studs, fabricated at OIL’s Duliajan workshop, have been transferred to the site to replace those that were damaged and deformed in the blaze, a statement released by the company on Monday said.

The blowout — – an uncontrolled release of gas and oil condensate — which occurred on May 27 has killed two firefighters, and caused a fire that has destroyed adjoining homes, injured three foreign experts examining the wellhead, and displaced at least 9000 people in the district, who have moved to relief camps.

Read more

You may also like

Comments are closed.