De-stress India’s thermal projects would need supply of 125 million tonne of coal, a challenge in today’s scenario

Amidst moves to revive stressed thermal assets of 45,000-MW capacity, what has slipped under the radar is the need for coal linkages if the projects are to be made viable. For, it is estimated that, operating at 70% PLF, these plants would annually require in excess of 125 million tonne of coal, with a possible […]

GVK to hike stake in Mumbai Airport to 64 per cent, to acquire Bidvest stake

GVK Airport Holdings Limited, a step down subsidiary of GVK Power & Infrastructure Limited, has decided to acquire 13.5 per cent stake of Bidvest in Mumbai International Airport Limited, thereby hiking it’s stake to 64 per cent from 50.5 per cent. The Hyderabad based diversified infrastructure company has exercised its right, under “Right of First […]