Timetable for new Mumbai Metro lines finalised
Trains on the new Mumbai Metro lines between Aarey and Dhanukarwadi, which will be inaugurated April 2 by CM Uddhav Thackeray, will run with a frequency of 10-11 minutes and have the capacity to carry over 3 lakh passengers every day. There will be nine rakes operating over 150 trips every day on the lines between 6 am and 10 pm.
The Mumbai Metropolitan Regional Development Authority has finalised the timetable for the lines which will run from April 2 after the inauguration.
The MMRDA is constructing a 35-km stretch of two elevated metro corridors—Line 2A between Dahisar and D N Nagar and Line 7 between Dahisar East and Andheri East.








