Three firms have submitted bids to carry out the design work of Gurugram Metro’s 28.5-km line connecting HUDA City Centre and Cyber City.
The bids were received after the second round of bidding held in March 2023. The first bid was called in August 2022 and was cancelled due to poor participation. The new corridor will form a ring line through Gurugram and Old Gurugram via 27 stations.
According to the Haryana Mass Rapid Transport Corporation Ltd (HMRTC), the design work comprises detailed design of Viaduct (24.275 km) excluding stations, all components of 27 elevated stations and proof checking of all components of 0.715 km of special span length alignment.