Ramp work for high-speed corridor on Aroor-Thuravoor stretch begins

KOCHI: The National Highways Authority of India (NHAI) has commenced the critical construction phase for the entry and exit ramps of the six-lane elevated highway stretch between Aroor and Thuravoor, a crucial development set to ease congestion on the heavily choked Ernakulam-Alappuzha corridor. However, the momentum of work is being severely hampered by delays in the relocation of key electrical infrastructure by the KSEB.

Read more

You may also like

Comments are closed.

More in Newspapers