Mumbai-Ahmedabad bullet train: Breakthrough achieved for 4.88 km Shilpata-Ghansoli underground tunnel
By
Binu Mathew
A breakthrough was achieved for a 4.88 km-long tunnel between Shilphata and Ghansoli for the Mumbai-Ahmedabad bullet train project on Saturday morning, the National High Speed Rail Corporation Limited (NHSRCL) said.
Union Railway Minister Ashwini Vaishnaw was present at the Ghansoli shaft when this breakthrough was achieved by way of a controlled blast.








