Srinagar, Sep 29: Kashmir is currently grappling with a significant electricity crisis as it faces persistent load shedding, resulting from a substantial gap between the demand and supply of electricity, amounting to a staggering 300 Megawatts (MW).
Officials of Kashmir Power Development Corporation Limited (KPDCL) have cited two primary factors exacerbating this situation: a drought-like situation in Jammu and Kashmir leading to reduced water discharges in River Jhelum and River Chenab, affecting hydropower generation, and decreased purchases of power from outside power generation companies (Gencos) by the government.