GMRL to conduct study of three proposed underpassess

The Gurugram Metro Rail Limited (GMRL) has decided to conduct technical and feasibility study for construction of only three underpasses, out of the five proposed by the Gurugram Metropolitan Development Authority (GMDA) along the phase two of metro alignment to ensure smooth movement of traffic, said officials.

GMRL has decided not to consider two underpasses proposed by the authority at Railway Road (connecting sectors 3,4,5 roads) and Sheetla Mata road as these are not aligned with the metro project, and the railway line can be constructed without the proposed underpasses, said a senior GMRL official, adding that the underpass at Bakhtawar Chowk which falls in the phase one of the metro project will be constructed.

Read more

You may also like

Comments are closed.