The Brihanmumbai Municipal Corporation (BMC) will highlight the disaster resilience capacity of the Mumbai Coastal Road Project (MCRP) in the upcoming G20 second Disaster Risk Reduction Working Group (DRRWG) meeting to be held in Mumbai between May 23 – 25.
Stretched along the western coastal stretch of Mumbai, the 10.58km long road is going to be a high speed corridor that will connect the Princess Street Flyover in Marine Drive with the Bandra Worli Sea Link (BWSL) through a series of tunnels, arterial roads, traffic interchanges and flyovers. Currently, the the project is in the final stage of construction and is expected to be made operational by the end of this year.