{"id":87746,"date":"2016-10-18T11:39:19","date_gmt":"2016-10-18T11:39:19","guid":{"rendered":"http:\/\/infralive.com\/web\/?p=87746"},"modified":"2016-10-18T11:39:19","modified_gmt":"2016-10-18T11:39:19","slug":"pm-narendra-modi-dedicates-3-hydroprojects-to-nation-in-himachal-pradesh","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/pm-narendra-modi-dedicates-3-hydroprojects-to-nation-in-himachal-pradesh\/","title":{"rendered":"PM Narendra Modi dedicates 3 hydroprojects to nation in Himachal Pradesh"},"content":{"rendered":"<p>Prime Minister Narendra Modi today dedicated to the nation three hydro-electric projects (HEPs) with a generating capacity of 1,732 MW in Himachal Pradesh. <\/p>\n<p>All the three power projects &#8212; Koldam HEP (4&#215;200 MW) of NTPC, Parbati HEP Stage-III (4&#215;130 MW) of NHPC and Rampur HEP (6&#215;68.67 MW) of SJVN &#8212; are equipped with generating equipment supplied and commissioned by Bharat Heavy Electricals Limited (BHEL), state-owned BHEL said in a statement today. <\/p>\n<p>Himachal Pradesh Governor Acharya Devvrat, Chief Minister Virbhadra Singh, Union Health Minister J P Nadda and Power Minister Piyush Goyal were present on the occasion. <\/p>\n<p>BHEL has a vast experience in hydro-electric projects having contracted more than 500 hydro generating sets with a cumulative capacity of more than 29,000 MW of various ratings in India and abroad. <\/p>\n<p>BHEL&#8217;s hydro installations are in operation in India and across the world in Azerbaijan, Bhutan, Malaysia, Nepal, Taiwan, Tajikistan, Rwanda and Vietnam. <\/p>\n<p>The company is executing HEPs of around 3,300 MW in the country, which are at various stages of implementation, in addition to major hydropower projects in DR Congo and Bhutan. <\/p>\n<p>More of hydroprojects means reduction of greenhouse gas emission, which helps in achieving a low carbon path. The government is contemplating inclusion of large hydro projects in the fold of renewable energy to provide an impetus to these projects.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Prime Minister Narendra Modi today dedicated to the nation three hydro-electric projects (HEPs) with a generating capacity of 1,732 MW in Himachal Pradesh. All the three power projects &#8212; Koldam HEP (4&#215;200 MW) of NTPC, Parbati HEP Stage-III (4&#215;130 MW) of NHPC and Rampur HEP (6&#215;68.67 MW) of SJVN &#8212; are equipped with generating equipment supplied and commissioned by Bharat Heavy Electricals Limited (BHEL), state-owned BHEL said in a statement today. Himachal Pradesh Governor Acharya Devvrat, Chief Minister Virbhadra Singh, Union Health Minister J P Nadda and Power Minister Piyush Goyal were present on the occasion. BHEL has a vast [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[132],"tags":[],"class_list":["post-87746","post","type-post","status-publish","format-standard","hentry","category-power"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/87746","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=87746"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/87746\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=87746"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=87746"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=87746"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}